Request For Comments: New Energy Regulations (NER)

Amendments on Energy Regulations (ER) No. 1-94 Program.

[Test only Microgrid System Provider Updates

MGSP Investment Forum Event / RA 11646

Energy sector rallies to restore power in Luzon following Severe Tropical Storm Kristine

In the aftermath of weather disturbances caused by Severe Tropical Storm Kristine, the energy sector has swiftly mobilized to restore power across affected areas in Luzon, prioritizing regions where floodwaters have receded.

 

Teams of linemen, engineers, and technical personnel from electric cooperatives in Northern and Southern Luzon, the Bicol region, the National Power Corporation, in case of off-grid areas, the National Grid Corporation of the Philippines (NGCP), Meralco and other private distribution utilities are working tirelessly to restore electricity in these areas. Their efforts include simultaneous clearing of debris, repairing downed power lines, conducting foot patrols, and rebuilding damaged substations. Despite the widespread damage, the dedication and expertise of these teams are on top ensuring that affected communities will soon regain access to electricity, with utmost priorities to hospitals, and other vital institutions.

 

As of 25 October 2024, four NGCP 69 kV lines remain offline, impacting four electric cooperatives. These are the Pangasinan I Electric Cooperative (PANELCO I), Central Pangasinan Electric Cooperative, Inc. (CENPELCO), Camarines Sur III Electric Cooperative (CASURECO III) and Batangas II Electric Cooperative (BATELEC II). Additionally, Batangas I Electric Cooperative (BATELEC I) is in total power interruption while 45 electric cooperatives are still experiencing partial power interruptions.

 

In terms of on-grid generation, the Calaca Power Plant has been on emergency shutdown since 24 October 2024, resulting in a derated capacity of 420 MW. The plant is expected to resume operations by Sunday, 27 October 2024.

 

In the Meralco franchise area, power outages have affected 419,012 customers, a significant reduction from over 580,000 affected earlier. Meralco is working to complete restoration by Sunday, 27 October 2024, as flood conditions improve.

 

The energy sector’s disaster response and rehabilitation efforts led by the Department of Energy, through the Task Force on Energy Resiliency (TFER) go beyond technical work, embodying the spirit of bayanihan, as national and local government agencies, private companies, and non-government organizations collaborate to bring normalcy back to these areas. The dedicated workforce of the energy sector remains on the ground, carrying each responsibility in challenging conditions until full power restoration is achieved. ###

Call for Comments and Recommendations on the Joint Memorandum Circular on the Guidelines on the Availment of Preferential Rights Granted to Electric Cooperatives Under Republic Act 7160

 

CALL FOR COMMENTS

The Department of Energy is hereby requesting the Electric Cooperatives to submit their comments and recommendations on the draft circular.

You may download the attached word file of the matrix to guide you in your submission.

Deadline of submission is on or 22 OCTOBER 2024 to be sent to the EPIMB with details as follows:

You may send comments/recommendations through the following:

  • Addressee:

Director Irma C. Exconde
Electric Power Industry Management Bureau
4th Floor DOE Bldg., Energy Center, Rizal Drive
Bonifacio Global City, Taguig City

 

ADVISORY: NEW BANK ACCOUNT DETAILS FOR ONLINE PAYMENT TRANSACTIONS OF THE DEPARTMENT OF ENERGY (DOE) - MAIN OFFICE EFFECTIVE ON NOVEMBER 04, 2024

 

 
Advisory 2024-09-002-SEC Continued Implementation of Section 3 of the Supplemental Operating Guidelines under DOE Advisory No. 2024-08-001-SEC

 

ADVISORY NO. 2024-09-001

 

 
INVITATION FOR PUBLIC CONSULTATION OF THE DRAFT DEPARTMENT OF ENERGY (DOE) - DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) JOINT CIRCULAR (JC) NO. 4, SERIES OF 2024

 

ANNOUNCEMENT

 

''The Department of Energy (DOE) is pleased to announce that we will be conducting a Public Consultation to discuss the draft DOE - Department of Public Works and Highways (DPWH) Joint Circular (JC) No. 4, series of 2024 titled, “Providing Further Policy Governing the Implementation of the Relocation and Payment of Electric Poles/Facilities owned by the Electric Cooperatives affected by the Implementation of Government Projects."

In this regard, we would like to invite one (1) to two (2) designated representative/s only from each agency/party to attend and participate in the aforementioned public consultations. For reference, attached are copies of the draft DOE-DPWH JC No. 4 and the provisional program of activities.

For registration and confirmation of attendance on or before 04 September 2024, you may register thru the confirmation link or scan the QR code below. The specific venue or meeting link will be sent later to the confirmed participants.

Below are the details of said activity.

Date and Time: Venue: Registration link:

September 05, 2024,
1 :00 PM - 4:00 PM

Virtual https://forms.office.com/r/1Jk3h5rpkt

You may also scan the QR code below for confirmation of attendance:

 

Further, you can still submit comments on the draft JC No. 4 before or until 13 September 2024. The link for Call for Comments is provided below:

https://prod.doe.gov.ph/site/epimb/articles/group/notices-and-releases?category=Announcements&display_type=Card

For other related concerns, please contact Mr. Dan Kenard Abrial from the Power Market Development Division (PMDD) through telephone number 8479-2900 local 264 or email him at [email protected]. .

 

 

Advisory on the Guidance on the Utilization of Electrification Fund (EF) Pursuant to the Implementation of Department Circular No. DC2018-08-0021


 

CALL FOR COMMENTS ON THE DRAFT DOE-DPWH JOINT CIRCULAR NO. 4, SERIES OF 2024, PROVIDING POLICY GOVERNING THE IMPLEMENTATION OF THE RELOCATION AND PAYMENT OF ELECTRIC POLES/FACILITIES OWNED BY THE ELECTRIC COOPERATIVES AFFECTED BY THE IMPLEMENTATION OF GOV

The Department of Energy is hereby requesting all stakeholders and other interested parties to submit their comments on the draft DOE-DPWH Circular No. 4, Series of 2024 titled, "Providing Policy Governing the Implementation of the Relocation and Payment of Electric Poles/Facilities owned by the Electric Cooperatives affected by the Implementation of Government Projects"

Attached are the copy of the draft Joint Circular and the Template of Comments for your submission. 

The deadline for submission of comments is on or before 13 September 2024.

You may send comments/recommendations through the following: 

Fax: (02) 8840-1773

Email: [email protected] 

Addressee: 
Irma C. Exconde 
Director IV 
Electric Power Industry Management Bureau
4th Floor DOE Bldg. Energy Center, Rizal Drive
Bonifacio Global City, Taguig City 

 

Attachments (Click to view/download file): 

1. Joint Circular DOE-DPWH No.4 on Relocation of Poles

2. Template of Comments

Notice relative to Public Consultation on Revised IRR on RA11646

We would like to inform you that the Public Consultation on the "REVISED IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 11646, OTHERWISE KNOWN AS “THE MICROGRID SYSTEMS ACT”. will be rescheduled. This change is made to ensure that the target participants will have more time to review  the draft  and for us to be able to solicit valuable inputs to improve the revised IRR. New event details are as follows:

 
Date : 06 September 2024
Time : 9:00AM - 02:00PM
Venue : To be determined
Set - Up : Face to Face (Hybrid to accommodate virtual participants)
 
We understand that this change may cause some inconvenience, and we sincerely apologize for any disruption this may have caused. We are committed to ensuring that the event runs smoothly on the new date, and we look forward to your continued support and participation.
 
To ensure that we can better organize the event, we kindly ask all those interested in participating to register online by clicking and scanning the QR code below. Please indicate whether you will attend in person or virtually. Only registered participants will be permitted to attend and registered virtual participants will be provided with the meeting link.
 

 
For further queries, please coordinate with Engr. Marc Louie L. Olap, Chief of the Rural Electrification Administration and Management Division at (02) 8479-2900 local 417 or email at [email protected] .

Thank you for your understanding and cooperation.

CALL FOR COMMENTS ON THE PROPOSED REVISED IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 11646, OTHERWISE KNOWN AS "THE MICROGRID SYSTEMS ACT"

The Department of Energy is hereby requesting all interested parties to submit comments on the draft Department Circulars entitled "REVISED IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 11646, OTHERWISE KNOWN AS "THE MICROGRID SYSTEMS ACT".

Proposals/Comments will be accepted until 23 August 2024 and you may send them through the following:

Email: [email protected]

Addressee:
Director Irma C. Exconde
Electric Power Industry Management Bureau
4th Floor DOE Bldg., Energy Center, Rizal Drive
Bonifacio Global City, Taguig City

Attachments (Click to view/download file): 

1. Draft Department Circular
2. Template for Comments

ADVISORY ON THE TEMPORARY SHUTDOWN OF THE DEPARTMENT OF ENERGY (DOE) COMPETITIVE SELECTION PROCESS (CSP) E-BASED PORTAL FOR THE PURPOSE OF SYSTEM ENHANCEMENT

 

Attachment (Click to view/download file): 

Invitation to Bid for 2nd Round of MGSP - Competitive Selection Process 

Pursuant to Republic Act 11646otherwise known as, “An Act Promoting The Use Of Microgrid Systems To Accelerate The Total Electrification Of Unserved And Underserved Areas Nationwide” and the Department of Energy (DOE) Circular Number DC2022-05-0017 entitled “Rules and Regulations to Implement Republic Act 11646”, the DOE hereby invites interested and qualified parties to participate in the conduct of Competitive Selection Process (CSP) for the Microgrid Systems Provider (MGSP) in the areas identified in Annex A of this Invitation to Bid (ITB).

We are pleased to provide you with access to important documents related to our upcoming activities. Please click on the link below to access the Invitation to Bid (ITB) and Terms of Reference (TOR):

Access ITB and TOR Documents

Additionally, we have made it even more convenient for you to access these documents. Attached herewith is a QR code that provides direct access to the ITB and TOR folder. Simply scan the QR code with your smartphone or compatible device to effortlessly access the aforementioned documents.

Thank you for your cooperation.

Microgrid System Provider Team

ADVISORY ON SUPPLEMENT TO THE COMPETITIVE SELECTION PROCESS (CSP) ADVISORY DATED 16 AUGUST 2019

 

Attachment (Click to view/download file):